Process of Our Work
Lining The Pipe
Our crew inverts the prepared liner and a calibration tube (bladder) into the existing pipe to form a pipe within a pipe. An inversion tool and air pressure are used in this process. The bladder is filled with hot water to cause the epoxy solution to harden.
Internal View of Lined Pipe
After the liner has been installed and cured, a final video is used to inspect the final product.
